The church wanted a sidewalk from their classroom to the children’s playground. We started by digging the area for the sidewalk.

 

FFC Church  Sidewalk

FFC Church Sidewalk

FFC_Sidewalk_sm_003

 

 

 

 

 

 


 

After the area was dug, we started forming the sidewalk so that concrete could be poured. While digging and forming the sidewalk, the church also decided they wanted a small concrete slab for the children’s playground.

 

FFC_Sidewalk_sm_004

 

 


 

After pouring the concrete, we removed the majority of the air bubbles from the concrete so it will not crack after the concrete is cured. After the concrete was cured, we removed the form boards. Finished concrete pad looks great!

 

FFCSidewalk_sm_005

 

This is the sidewalk from the classroom at the end of the sidewalk to the playground.

FFCSidewalk_sm_006


We also repaired the door frame on the front of the church. We replaced the rotten and warped wood that was in the door frame. We also power washed the outside wall, steps and columns.