The church wanted a sidewalk from their classroom to the children’s playground. We started by digging the area for the sidewalk. After the area was dug, we started forming the sidewalk so that concrete could be poured. While digging and forming the sidewalk, the church also decided they wanted a small concrete slab for the children’s playground. After pouring the concrete, we removed the majority of the air bubbles from the concrete so it will not crack after the concrete is cured. After the concrete was cured, we removed the form boards. Finished concrete pad looks great!